menu
Home导航 / Total War: Rome II / Punic Rebels (Hannibal at the Gates) / 科技 / Crane Mechanics
Crane Mechanics Punic Rebels (Hannibal at the Gates)Punic Rebels (Hannibal at the Gates) Improvements Tier 5

Crane Mechanics

Strong backs are not enough to lift all burdens.

The Romans adopted the principle of the crane from the Greeks and modified its design to create apparatus capable of lifting huge weights. Some of Rome’s most magnificent buildings undoubtedly benefitted from the use of cranes. The Pantheon, for example, has sections which weigh up to nine tonnes each and had to be lifted over nine metres. It is thought that the Romans used two types of crane. The first, the 'polyspastos', had a jib built from two timber beams in an inverted v-shape; the thickness and length of these beams would determine the weight the crane could carry. The second crane type, the 'rispastos', used a single beam jib and could be swung sideways but was not able to bear heavy loads.

汉化补丁: 3DM蒹葭汉化组

Improvements

Crane Mechanics

Node Set

Improvements Tier 5

research_points

1600

cost_per_round

0

Effects

  • 建筑建造成本-7% (所有区域)
  • 建筑建造成本-10% (所有区域)
  • 行省首府与次级城镇主要建筑时间-1 (所有区域)
Requires
Requires Technologies Canal & Dam SystemCanal & Dam System
Enables
Enables Technologies Monumental ArchitectureMonumental Architecture
Enables Buildings HippodromeHippodrome
Facebook